Adjacent Property - Principal Place of Residence Exemption?

Case Matter Citation:

Boyd v Chief Commissioner of State Revenue [2026] NSWCATAD 209

 

Court:

NSW Civil and Administrative Tribunal

Decision Date:

14 July 2026

Jurisdiction:

Administrative and Equal Opportunity Division

Parties:

Alexander Boris Feydor Boyd

(Applicant)

 

Chief Commissioner of State Revenue

(Respondent)

 

illuminated light bulbs in close up shot

The Applicant owns two adjoining properties on the Northern Beaches of Sydney in NSW.

The Applicant lives in one property and stores a vehicle and personal items in the other.

Revenue NSW assessed the Applicant for 2025 in relation to the property used for storage.

The Applicant’s claim is that the two adjoining Lots form the parcel of land which is his principal place of residence.

The Respondent’s claim is that the adjoining Lot is not exempt because it does not comply with the relevant provisions.  In addition, it has a separate building which is capable of being separately occupied.

Background

The Applicant successfully claims the principal place of residence exemption for the original Lot purchased in around 1974, being Lot 43, in which he has resided in since around 1978.

The Lot in question was purchased in around 2012, being Lot 45 which was reportedly purchased for storage of a vintage vehicle, along with other personal items because the original garage on Lot 43 was too compact.  The Applicant represents that the premises was not and is still not in a state to be occupied.

Summary of Evidence

The Applicant puts forward that he purchased Lot 45 from his neighbour and that it was in quite a rundown state.  The garden was overgrown, and the interior was rundown.  Because of this the Applicant decided not to live in the premises.   The only significant repair the Applicant performed on the building was a repair of the balcony which was in disrepair.  The garage is used for storage.  The utilities were disconnected.

The Applicant supplied a survey report in evidence dated 28 January 2026, which shows that the chimney on the premises of Lot 45 encroaches onto the original Lot 43.  This was not disputed by the Defendant.

The Applicant also relied on a building report prepared by Mr Drexler, an expert witness builder dated 14 January 2026.   Mr Drexler wrote in his report that the building is in a dilapidated condition, and not capable of being occupied.  The costs for remediation were stated as significant.

Mr Drexler was cross-examined by the Defendant.

The Defendant also relied on an expert witness building report, prepared by Mr Matthew Dale dated 19 March 2026.  Mr Dale disagreed with some of Mr Drexler’s report, however, did agree that the building on Lot 45 was not fit for occupation.  Mr Dale agreed that significant works would have to be undertaken to bring the premises up to a liveable condition but estimated these costs to be considerably less than Mr Drexler had estimated.

Applicant’s Contentions

The Applicant contends that he has used Lot 45 as an extension of Lot 43, by storing items and a vehicle on the adjoining block of land and therefore is entitled to an exemption of land tax as Lot 43 forms an extension of Lot 45.

The Applicant submits that Lot 43 and Lot 45 form the site of a single residence, taking into consideration common ownership, physical connection and accessibility, and unified use and occupation.

Clause 13(2)(b) of the Land Tax Management Act 1956 (‘LTMA’) is relevant here, which states the following:

13   Application of exemption to residence comprised of 2 or more Lots (other than strata Lots)

(1)  The principal place of residence exemption does not extend to a parcel of residential land that is comprised of 2 or more Lots of land, and that is used and occupied by the owner of the Lots (or by one of them) as a principal place of residence, unless—

(a)  the Lots are adjoining, and

(b)  the Lots are in the same ownership, and

(c)  the Lots are the site of a single residence (excluding any additional residential occupancy that may be disregarded under clause 4).

(1A)  Lots are in the same ownership if—

(a)  the Lots are owned by the same person or, if any of the Lots are jointly owned, the Lots are all jointly owned by the same persons, or

(b)  each Lot is beneficially owned by the same person or, if any of the Lots have more than one beneficial owner, each Lot is beneficially owned by the same persons (subject to clause 11).

(2)  For the purposes of this clause—

(a)  separate Lots are not to be regarded as adjoining merely because one Lot has a single corner point on its boundary that is common to the boundary of another Lot, and

(a1)  separate Lots that are divided by a fence, wall or other structure are not to be regarded as adjoining unless access is readily available between the Lots, by means of gates, doors, steps, stiles, elevators or openings or by similar means, and

(b)  separate buildings erected on separate Lots are not to be regarded as a single residence if the buildings are separately occupied or capable of being used for separate occupation.

(3)  This clause does not apply to land comprised of 2 or more strata Lots.

Clause 13(2)(b) may apply if it was considered that the building on Lot 45 was capable of being used for separate occupation.

The Applicant suggests that because the building on Lot 45 encroaches onto Lot 43, it cannot be considered that it is a separate building on a separate block.

The Applicant also points towards the Respondent as having to prove application of 13(2)(b), should the Respondent rely on its application; that is those requirements that the building was occupied, or capable of being occupied, as at 31 December 2024, which the Applicant says the evidence does not support.

The Applicant states that firstly, the building on Lot 45 has been used only as an ancillary space to the home on Lot 43.  Secondly, the report from expert witness Mr Drexler confirms that the premises was not maintained for decades prior to the Applicant’s purchase of the property in 2012.

Respondent’s Contentions

The Respondent contends that there are four unities expressed in Clause 13 of the LTMA; those being unity of use, occupation and title, and undivided by physical separation.  In addition, the Respondent puts forward that Clause 13 suggests there should only be one residence on two or more Lots for the exemption to apply.

The dispute lies in whether the two Lots form one Lot when each Lot has a residence capable of being used for separate occupation.

The Respondent accepts that the chimney part of the residence on Lot 45 encroaches the boundary of Lot 43, however contends that Clause 13(2)(b) still applies, considering that this is not the correct interpretation of Clause 13.

This leaves the question of whether the residence on Lot 45 was capable of being used as a residence for the relevant time, which the Respondent says it was and that Mr Drexler’s expert witness testimony should be rejected.

Issues for Determination

The Tribunal defines the central issue to this matter to be whether Clause 13 applies.  There are two areas of qualification in this section relevant to this matter; the first being whether the Lots are ‘the site of a single residence’ under 13(1), and whether the separate buildings are separately occupied or capable of being used for separate occupation under Clause 13(2)(b).

Proper Construction of Clause 13(2)(b)

Submissions of the Applicant

The Applicant relies on the definitive interpretation of the words of this clause, being that the encroachment of the building in Lot 45 onto Lot 43 means they are not ‘separate buildings erected on separate Lots.’  The Respondent’s position of the encroachment only being minor invites an ‘unexpressed criterion of degree’, because the words Parliament chose does not refer to a minor or insignificant encroachment as irrelevant.

The Applicant refers to sections 33 and 34 of the Interpretation Act 1987 (NSW) (‘Interpretation Act’) rather than the Explanatory Note and Second Reading Speech concerning the enactment of Clause 13, suggesting that reference to extrinsic material for its definition is not applicable here because the clause is not ambiguous nor obscure, nor does its ordinary meaning lead to a ‘manifestly absurd or unreasonable result’.

Submissions of the Respondent

The Respondent relies on the fact that the encroachment onto Lot 43 is only minor and refers to the extrinsic material for the State Revenue Legislation Amendment Act 2008 (NSW), and to the case of Bennett v Chief Commissioner of State Revenue [2022] NSWCATAD 324 (Bennett), whether the Tribunal considered the concept of s “single residence” where there was a connecting annex between the two houses on adjoining properties.

The Respondent suggests that the purpose of Clause 13 would not be served if a minor encroachment was considered relevant.

Consideration

The Tribunal accepts the Applicant’s submission that reference to extrinsic material is not warranted in this context.

The Tribunal accepts that the Clause needs to be interpreted based on the usual principles for statutory construction, and that the Parliament need not expressly mention the possibility of encroachment as it is a peripheral matter.

The Tribunal also states that Sections 34 and 34(1)(a) and (b)(ii) of the Interpretation Act suggests that the interpretation of the Clause needs to be taken into context considering the purpose or objective of the underlying statute.

The Applicant suggests a narrow interpretation of ‘erected on separate lots’ and splits this section into ‘separate’ and ‘lots’.  However modern interpretation insists that the section should be read as a whole and in context.

The Tribunal does not see fit to import words such as ‘wholly’ or ‘entirely’ into the meaning of this section, and Parliament did not see fit to include an additional clause covering unusual or peripheral matters such as unlawful encroachment.

It is fair to say that it would be generally assumed, when Parliament constructed the chosen text, that the buildings would be erected on separate lots.

The Tribunal therefore found that Clause 13(2)(b) is engaged, which leads to the second inquiry of whether the dwelling on Lot 45 was capable of being separate occupation as at midnight on 31 December 2024.

Was Lot 45 Capable of Being Used for Separate Occupation as at Midnight on 31 December 2024?

Submissions of the Applicant

The Applicant submits that even based on the Defendant’s expert witness report, the dwelling on Lot 45 was in need of significant repair work before it could be occupied as at midnight on 31 December 2024.  In addition, the house was in a state of significant disrepair prior to the date of purchase.

The estimated cost to bring the dwelling on Lot 45 to a liveable standard is estimated by the Applicant’s expert witness to be at around $753,687.00 which includes structural, safety and compliance works.

The Respondent’s expert witness estimates the cost to bring the building up to a liveable standard is much less at $82,000.00.  However, the Tribunal considers that this is not an insignificant sum, and that the expert witness acknowledges that work must be done prior to any occupation.  Some of the issues are agreed upon between the two expert witnesses; namely mould, dampness and water ingress.  The Tribunal considers that the phrase ‘capable of being used for separate occupation’ does not necessarily mean compliance with current building standards.  However serious noncompliance with safety matters is relevant.

The Tribunal considers that the expert evidence should be given substantial weight as the question is an objective one.

Submissions of the Respondent

The Respondent submits that the expert witness for the Applicant has overstated the necessity for repairs.  The Respondent considers that its own expert witness, Mr Dale, points out more superficial issues that require attention rather than significant structural issues, which do not render the dwelling on Lot 45 uninhabitable.

The Respondent submits that 13(2)(b) does not require the dwelling to be fit for comfortable occupation on an immediate basis, nor renovated to the highest possible standard.

The Respondent further submits that the essence of Clause 13(2)(b) requires certain standards of occupation to be taken into consideration such as safety, health, connection to utilities.  In addition, it does not need to be immediately capable for occupation but a consideration for future use is relevant depending on the extent of the works required.  The standard of renovations should also be considered.

The Respondent refers to the standards suggested by the Residential Tenancies Act 2010 (NSW)(RTA), which states that premises are fit for habitation if they are structurally sound, in a reasonable state of repair, not subject to significant dampness and are not liable to collapse.

The Respondent’s expert witness submits that the dwelling could be occupied whilst the repairs on the house were undertaken progressively.

The Respondent suggests that their expert witness report as submitted should be preferred to that submitted by the Applicant, as the Applicant’s expert witness made recommendations based on assumptions and current compliance standards which are not applicable in the circumstances.

Consideration of the Tribunal

The Tribunal comments that the relevant date is not just on the stroke of midnight on 31 December 2024, but rather such time before and after this date.

The Tribunal also brings up the point that the two expert witness reports were conducted a significant time after the relevant date, and indeed after rectification work to the balcony.  Considering that the experts did not see the rectification work as uncontroversial, the Tribunal can consider that the rest of the rectification work was required during the relevant period.

The Tribunal understands that Mr Drexler for the Applicant conceded to the use of assumptions and the unnecessary reference to current building codes for non-essential repairs.

The Tribunal also notes that Mr Dale for the Respondent accepts that further investigation is warranted for some of the issues.

The Tribunal views the issues with mould, damp and water ingress as significant issues that go to health and safety of potential occupants.  The two expert witnesses varied in the level of remediation required on this issue, however both accepted it was a problem.

The Tribunal views that four rooms in the house required remediation for mould and damp and rejects the contention by the Respondents expert witness that the dwelling would be liveable during the undertaking of this work.

The Tribunal did not accept that the waterproofing membranes had failed in the wet areas based on an assumption that the house is old.

 The Tribunal also did not accept that the utilities were in a state of disrepair just because they are old.   The Tribunal could not make a finding on the state of the electrical wiring and did not consider the Applicant had discharge his onus on this matter.

Both experts accepted that the windows were sealed, which the Tribunal saw as a health and safety concern that would need to be rectified.

Both experts accepted that works were required to be done on several balconies.  The Tribunal did not accept the Respondent’s expert witness assertion that the house was habitable whilst this work was being undertaken; unstable balconies that are at risk of collapse render the dwelling uninhabitable.

The time that would be required to complete the required building works is not necessarily a factor to be considered by the Tribunal.  However, the Tribunal did accept that these necessary works render the dwelling on Lot 45 uninhabitable at the relevant taxing date.

The fundamental building requirements were agreed by the expert witnesses, and the lack of maintenance or remedial work performed by the Applicant and prior to the Applicant’s purchase of the property render the dwelling uninhabitable at the taxing date and could not be inhabited whilst the building works were undertaken.

Orders

The Tribunal made the Order that the decision under review be set aside and substituted with a decision that the principal place of residence exemption be applied to Lot 45.